10 min read

101 BlogConstruction business
October 1, 2026

Russian-language Telegram channels: renovation and business ideas

Five channels with visual examples and business content. The channels and original screenshots are in Russian; check advice and contractors’ qualifications separately.

Russian-language Telegram channels: renovation and business ideas

This selection brings together five Russian-language Telegram channels with interior ideas and construction business content. The channels and the text in the original screenshots are in Russian. The illustrations show examples of posts; they do not confirm the channels’ current features or the authors’ terms of service.

Contents:

  1. Azbuka remonta
  2. DIVAN.RU
  3. Design and Renovation (Дизайн и ремонт)
  4. Renovation School (Школа ремонта)
  5. Construction Business | 101 App

Azbuka remonta

This channel brings together many interesting layout and design ideas. You can subscribe to broaden your visual references, see what contemporary renovations look like and find inspiration for changes to your apartment’s interior.

DIVAN.RU

The DIVAN.RU channel features furnishing and interior examples. The original screenshot shows collections of furniture and apartments, including a small apartment. You can use these posts to find design and furnishing ideas for your space.

Design and Renovation (Дизайн и ремонт)

Collections of finished interior photos and floor plans help you gather ideas before renovating. You can find interesting layout solutions, unusual uses of materials, appealing colour schemes and furniture ideas here. If a post includes the project author’s contact details, ask them directly about cooperation terms and whether you can commission a project.

Renovation School (Школа ремонта)

Renovation School is a Russian-language channel with ideas for furnishing your home. The original screenshot shows a bedroom interior tour. Look through the posts for suitable ideas; check separately whether the advice applies to your space.

Use tips from collections and tours of finished apartments as a starting point for discussion. For technical decisions, consider the conditions at your property and consult a relevant specialist.

101 Telegram channel

The 101 Telegram channel focuses on entrepreneurship and construction business. The original screenshot shows a podcast about business development and partnerships. You can look here for material to discuss company management; the existence of a post does not in itself confirm a particular business result.

Subscribing to the channel and using the 101 App do not confirm a contractor’s qualifications. Before choosing a contractor, check their work, references and contract terms separately. The link in this selection leads to the channel; the ability to post a request and receive replies through a separate chat is not confirmed here.