10 min read

101 BlogConstruction business
October 2, 2026

6 Telegram channels about interior design

Six Russian-language Telegram channels for professionals and anyone who wants to understand design before renovating their apartment. This selection offers inspiration through news, layouts, furniture, materials and product design. The retained illustrations show Russian-language posts from the original selection; check that the channels are still relevant before subscribing.

6 Telegram channels about interior design

Contents:

  1. Design Mate
  2. Планировочка
  3. торшерчики & фужерчики
  4. материал, найдись!
  5. Каталог Алвара Аалто
  6. 101 Telegram channel

Design Mate (in Russian)

This channel is primarily for professional designers who want to keep up with industry news: inventions, unique projects and interesting work by colleagues. People with a general interest in design can also find useful material here.

Планировочка (in Russian)

Here you can find unusual design projects for apartments with less-than-ideal layouts that have been successfully reworked, as well as unusual interior solutions.

торшерчики & фужерчики (in Russian)

A Telegram channel with selections of interior items that look as though they came from Pinterest. If you have already gone a whole day without ordering anything from an online marketplace and want to keep that streak going, you may want to avoid this one.

материал, найдись! (in Russian)

In the original selection, «материал, найдись!» is presented as an author-led blog about unusual materials, products from local brands and interior design ideas. For example, the retained illustration shows a plaster ceiling with a floral bas-relief in the Las Margaritas restaurant. At the time of checking, the mtrl_io (in Russian) link leads to the mtrl page with the description ‘Where to read us, find brands and contact the editorial team’. The editorial page points to the active «материал, найдись!» (in Russian) channel. Check the team’s current platforms before subscribing; earlier selections and the illustration below do not confirm the channel’s current feed.

Каталог Алвара Аалто (in Russian)

The channel is named after the Finnish architect Alvar Aalto. Its authors collect photographs and links to unusual interior items, some of which resemble works of art. You can also find reviews of interesting design solutions here.

101 Telegram channel (in Russian)

‘Business platform — 101’ (in Russian) is a channel for entrepreneurs. The original selection recommends it to designers and finishing contractors as a source of management accounting advice: invoices, settlements with contractors and communication with builders. This is another part of the job alongside finding interior design ideas.

The 101 app helps you organise a designer’s work:

  • you can remotely monitor progress on the construction site;
  • you can track referral fees for deals with a construction company; the terms and amount of the fee depend on your agreements;
  • reports and access permissions help clients see the information available to them about work and financial transactions; this may reduce the need for calls to clarify details;

Find out how the 101 app can help your business. Book a free meeting with an expert to discuss what 101 offers and how to organise communication with builders.