You can trace direct costs to a specific cost object, such as a project or stage. Indirect costs relate to several cost objects or to the company as a whole. If you allocate these costs across projects, choose an allocation rule in advance and apply it consistently.
Contents:
How to distinguish direct costs from indirect costs
First, identify the cost object. If you are calculating the cost of renovating a flat, tile purchases documented on a delivery note for that job and the crew’s work on it can be assigned directly to the project. Record the project, cost type and supporting reference so you can check the entry against the document.
If an office or accounting team serves several projects, track those costs separately. To calculate the full cost of each project, choose a basis for allocating shared costs that reflects how they arise. For example, if the amount of shared services depends on the time the team spends on each project, you can allocate those costs using the hours logged for each project. Record the period, source data and calculation rule so the shares can be checked.
Which cost characteristics to check separately
Whether a cost is direct or indirect depends on how it relates to the cost object. Whether it is fixed or variable depends on how the total cost changes as the volume of work changes over the period you are analysing. A cost can be both direct and fixed, or both indirect and variable.
| Cost type | Example |
|---|---|
| Direct variable | Tile use on a particular project if it varies with the area being tiled. |
| Direct fixed | A fixed monthly equipment hire charge for one project, for the month in question. |
| Indirect fixed | Fixed rent for an office that serves several projects. |
| Indirect variable | A commission on a shared pool of enquiries if the amount depends on the number of enquiries and cannot be traced directly to individual orders. |
What the cost is incurred for is another characteristic. For example, equipment shared across several sites may count as a production cost and be indirect for each project. To calculate the contribution margin, subtract variable costs from revenue for the same period. The result shows how much is left to cover fixed costs and contribute to profit.
How to track costs in 101
- Choose a project and set up expense categories (in Russian), such as labour, materials and transport. Decide which categories and stages you will use to check costs.
- Enter planned quantities and amounts in the estimate for the stage. As work is completed and purchases are made, record the actual line items in reports (in Russian) for the relevant project. Check each name, quantity, unit and any monetary fields you can see against the supporting documents.
- When you record a purchase (in Russian), attach the supporting document. If the mobile app allows you to scan a suitable receipt using its QR code, check the recognised line items and amounts before saving. After scanning, check the added transfer before you save. Record payment as a separate transfer (in Russian) only if the money has actually been paid and the payment has not already been recorded.
- To check internal costs, use the same project, period, expense categories and type of amount for both sides of the comparison. Compare the estimate and actual figures using the fields you can access in the documents. In the Gantt chart’s Plan vs Actual panel (in Russian), you can compare client prices or profit with markup taken into account.
- You can track shared company expenses separately in the Company Fund (in Russian) if your plan and permissions give you access to it. For example, record office rent under an internal expense category and check the company figures for the period you selected.