15 min read

101 BlogAbout the app
October 3, 2026

Gectaro and the 101 App: comparing tools for construction estimates and management accounting

Compare Gectaro and 101 by construction company tasks, limitations and verified pricing. Prepared by 101 authors; historical images and individual reviews are identified separately.

Gectaro and the 101 App: comparing tools for construction estimates and management accounting

Contents:

  1. Features of Gectaro and the 101 App
  2. Functionality of Gectaro and the 101 App
  3. Interface and ease of use
  4. Mobile access
  5. Collaboration
  6. Integrations
  7. Support and training
  8. Pricing
  9. Community and development
  10. User reviews
  11. Comparison table: Gectaro and the 101 App
Gectaro and the 101 App address construction project management tasks, but offer different tools and ways of organizing work. This comparison was prepared by authors from 101. It is editorial content produced by the 101 team. No independent testing was conducted. Features and prices were checked against the providers’ websites on 3 October 2026. Before choosing, test the services with your own tasks. The historical Russian-language images below have been retained as examples of earlier interfaces and individual reviews; they do not establish current prices, feature availability for every role, or results for every company.

Features of Gectaro and the 101 App

Gectaro is a tool for project-based businesses, covering estimates, finance, procurement and work monitoring. The service combines a web platform with a mobile app for site supervisors. You can use rate directories and import estimates from Excel; imports from Russian estimating programs, including Grand-Smeta, depend on the plan and the source format. Check with the provider about service and support availability in your country.

In Gectaro, you can manage your own materials and rates, financial transactions, purchases and settlements. Access and approval procedures depend on roles and project settings. Check the available tools in a demonstration: how convenient the interface is and how long it takes to learn depend on your team’s tasks.

Historical Russian-language Gectaro page with advertising figures.

The 101 App was designed for collaboration within a construction company, covering projects, estimates, reports, documents and finance. Mobile apps and a web version are available. Management accounting helps bring working data together, but does not, on its own, replace mandatory construction regulations, financial accounting or tax accounting.

In 101, you can use price lists, prices and materials when preparing calculations. How quickly you can produce an estimate depends on how complete the price list is and how complex the work is. Before implementation, test your usual workflow with your own example and plan staff training.

Historical Russian-language 101 homepage.

Functionality of Gectaro and the 101 App

Gectaro offers estimates, work schedules, financial and inventory accounting, procurement, tasks, discussions, documents and reports. The provider’s website (in Russian) advertises estimates prepared ‘7 times faster’ and purchasing savings of ‘up to 20%’. These figures are presented by the provider in promotional materials. No independent comparison of efficiency was conducted here; savings for your company are not guaranteed.

Historical Russian-language Gectaro financial transaction journal.

The 101 App also includes projects, price lists, estimates, records of work and materials, income and expenses, approvals, documents, tasks and a Gantt chart. Clients can take part in approvals within the permissions granted to them. Having a smartphone alone does not determine access: a suitable platform, an account and project permissions are required.

The main idea behind 101 is collaboration using management data. Participants record project events within their permissions, while the manager monitors reporting and settlements. This may reduce the manual consolidation of spreadsheets, although time and cost savings depend on the company’s processes. The service does not remove the need for professional accounting support where it is required.

Approvals and event histories help retain information about work and interactions between the parties. The 101 article on evidence (in Russian) discusses the Russian legal context. The legal effect of an electronic approval depends on the applicable law, the contract and the circumstances; a status in the app does not guarantee that it replaces a formal completion certificate or determines the outcome of a court dispute in any country.

Historical Russian-language example of an event approval in 101.

Interface and ease of use

Gectaro provides an estimate, a work schedule and project financial indicators. The historical screenshot of a demo project retained below shows the plan, forecast, financial balance, revenue and costs. It illustrates the screen layout; ease of use should be assessed in the current version with your own tasks.

Gectaro combines tools for management accounting, planning and collaboration. Check which features are included and who can access them for the relevant plan and role.

Historical Russian-language analytics screen for a Gectaro demo project.

The mobile version of 101 uses projects, events, price lists and transaction histories. The historical screenshot below shows an earlier home screen. The current interface may differ; the available sections and actions depend on the platform and the participant’s permissions.

Mobile access

Gectaro offers a web platform and an app for site supervisors (page in Russian). According to the provider’s description, the mobile tool is intended for work reports and photos from the construction site. Check the capabilities of the web version and the app separately.

Historical Russian-language Gectaro settlement cards.

101 has mobile apps and a web version. They let you work with project data; available features depend on the version and permissions. The historical screenshot below shows the Excel price-list import dialog before a file has been selected. It does not show a completed import. You can use a smartphone on site; the appropriate format depends on the particular task.

Historical Russian-language Excel import dialog in 101 before file selection.

Collaboration

Gectaro provides roles for team members. The historical image below shows user role selection and permission settings. An open form does not mean that an employee has been added or changes have been saved. Check the specific roles and configuration options in the current version.

The Gectaro update of 13 January 2020 (in Russian) describes a Telegram bot for site supervisors’ reports on completed work. The current pricing page also mentions reporting through a Telegram bot. Check availability and setup for this workflow with the provider; the older announcement does not establish every capability of the current bot.

Collaboration in 101 helps divide report preparation, checking and approvals among participants. The specific process depends on permissions, agreements and project settings. The current screenshot below shows events marked ‘Awaiting confirmation’ and ‘Confirmed by partner’; confirming an event does not, on its own, prove payment. These are fictional Forge Construction data in the company owner’s account, with a Russian-language interface. Access for other roles depends on permissions.

Russian-language 101 events screen with statuses awaiting confirmation and confirmed by a partner

Current Russian-language 101 events screen in the demo company Forge Construction, using the owner’s account: an event awaiting confirmation and an event confirmed by a partner.

Historical Russian-language example of 101 balances for funds entrusted to a participant.

Integrations

The Gectaro website (in Russian) advertises more than 400 services through the Albato integration catalog, including amoCRM, Bitrix24, 1C, Google Drive and Telegram, as well as an Open API. Check connection requirements, necessary subscriptions and the data exchanged for your particular workflow. The promotional block below does not prove that an integration has already been configured.

Historical Russian-language promotional block for Gectaro integrations.

101 supports importing price lists from Excel. The current screenshot below shows the import form open in the Forge Construction owner’s account before file selection: the import has not yet been performed. The interface is in Russian and the data are for demonstration. Preparing a file using the current template and accessing the price list depend on permissions.

Russian-language Excel price-list import form in 101 before file selection

Current Russian-language Excel price-list import screen in the Forge Construction owner’s account before file selection; no import has been performed.

The 101 products page (in Russian) presents a public API, MCP, a ChatGPT plugin and integrations with amoCRM, Bitrix24 and Yandex Disk. For advanced analytics and data exchange, including the possibility of connecting DataLens, check the supported workflow in the 101 community (in Russian): a ready-to-use DataLens connection for every account has not been confirmed here.

Support and training

Gectaro offers implementation assistance (page in Russian) and training. Agree on the scope of data migration, process configuration and integrations with the provider. Assess the speed and quality of support against the specific service terms. A general promise does not establish those terms.

A technical support chat (in Russian) is available for 101. An AI assistant and a specialist may help with product questions; this article does not guarantee that every issue will be resolved or specify a guaranteed response time.

101 offers a free online presentation with an expert lasting 30–60 minutes. You can discuss your company’s tasks and whether the system is suitable; check booking arrangements and available times with the 101 team.

Pricing

On 3 October 2026, the Gectaro pricing page (in Russian) listed the following terms for its Russian offer: prices in rubles per month when paid annually, with the first 7 days free. These are not local prices for other countries; check availability and the final offer with the provider.

  1. The Starter plan is intended for small teams of up to 3 users. It allows an unlimited number of projects. The price is 21,166 ₽ per month when paid annually.
  2. The Basic plan is suitable for companies seeking structured management. It includes up to 8 users, an unlimited number of projects, backups by email, imports from estimating programs (Grand-Smeta, Smeta.Ru, RIK and others), and API integrations. The price is 33,333 ₽ per month when paid annually.
  3. The Business plan is designed for medium-sized companies wishing to organize their processes and finances. It provides access for up to 15 users, all the features of the preceding plans, and priority support. The price is 55,833 ₽ per month when paid annually.
  4. The Pro plan is intended for large companies seeking optimization and growth. It includes up to 30 users, all the features of the preceding plans and VIP support. The price is 81,500 ₽ per month when paid annually.

On 3 October 2026, the 101 website presented a free set of features: estimates, tasks, chats, a Gantt chart, documents, price lists, company creation, a knowledge base, video conferences, 50,000 AI tokens per month and MCP. Two paid plans are listed for additional features. The ruble prices below refer to the verified offer with annual payment; check the currency and payment terms that apply to your situation with the provider.

PRO: unlimited creation of events in a project and the Company Fund, event approvals with the client, sending documents to clients and contractors, and 200,000 AI tokens per month. On the verified page, the price is 1,400 ₽ per month when paid annually.

PRO+: PRO features, API access, event approvals in the Company Fund, documents with the company logo, advanced analytics, export and an event change history, and 500,000 AI tokens per month. On the verified page, the price is 3,800 ₽ per month when paid annually.

Community and development

Gectaro has a Telegram channel (in Russian) with product news. The historical screenshot below shows a post about a rate-directory update. The subscriber count in an older screenshot does not establish the community’s current size or activity.

Historical Russian-language post from the Gectaro Telegram channel.

In the 101 community (in Russian), you can discuss practical questions about using the product and share experience. The historical screenshot below shows a post about the referral program; its current terms should be checked separately.

Historical Russian-language post about the 101 referral program.

Communities are useful for exchanging experience and feedback. The existence of a channel and individual reviews does not, on its own, establish development timelines for features or guarantee that an issue will be resolved.

Reviews of the services

The historical Russian-language materials about Gectaro retained below include individual criticism, positive reviews and case studies published by the provider. The date and product version are not always visible, and one image does not identify the service’s brand. These materials are not independent testing of the current version and do not guarantee savings, establish that features are absent, or predict your company’s results.

Historical individual message criticizing Gectaro, in Russian
Historical Russian-language five-star reviews without a visible service brand
Historical Russian-language case study on the Gectaro website about saving time
Historical Russian-language case study on the Gectaro website about income growth
Historical Russian-language case study on the Gectaro website about working with estimates

The historical reviews of 101 below reflect their authors’ individual experiences. References to Russian government construction projects, the KS-2 form and taxes belong to the quoted context; they do not establish compliance with other countries’ requirements.

Historical Russian-language review about implementing 101
Historical Russian-language review of 101 on Russian government construction projects
Historical Russian-language review about mobile work in 101
Historical Russian-language review about financial accounting in 101

Comparison table: Gectaro and the 101 App

Criterion 101 App Gectaro
Interface simplicity and UX Mobile and web interfaces; assess them with your own tasks Web platform and app; assess them with your own tasks
Working from mobile devices Mobile apps and a web version Mobile app for site supervisors and a web platform
Preparing estimates and commercial proposals Price lists, estimates and documents Estimates, directories and imports
Purchasing records and inventory accounting Records of work and materials; check the inventory workflow Procurement and inventory accounting advertised by the provider
Management accounting and analytics Financial events, balances and analytics Financial accounting and management reports
Team collaboration Team, roles and approvals Team and participant roles
Integrations and API API, MCP and published integrations Albato and Open API; check connection terms
Training Free presentation lasting 30–60 minutes Training and implementation agreed with the provider
Implementation speed Depends on data preparation and team training Depends on implementation and the team’s tasks
Client account Client access and approvals within permissions Client access to estimates and schedules advertised by the provider
Flexibility of template configuration Price lists, work templates and formulas Rate directories and technological operations
Prices and plan availability Free features, PRO and PRO+; see the terms above Four plans, 7 days free; see the terms above
Bank integrations Check the required banking workflow separately Imports of transactions from banks and 1C advertised by the provider
Community Communities and support chat Provider’s channel, case studies and training

Both services offer construction project management tools. Gectaro combines estimates, planning, procurement and inventory accounting; 101 combines projects, financial events, approvals, documents, tasks and analytics. Your choice depends on your company’s processes, the team’s permissions, required integrations and budget. The table shows confirmed features and questions to ask during a demonstration. It does not establish a universal quality ranking of the services.

Before choosing, compare the providers’ materials with users’ experiences and test your own task in a demonstration:

Gectaro case studies are published on the provider’s website (in Russian); bear in mind that these are selected customer stories.

Reviews of 101 are available in the reviews chat (in Russian), while questions about current features can be discussed in the user community (in Russian). An individual review does not replace checking the product’s terms and capabilities.