The estimate header is the information block at the top of the document. Include the project, the client, the contractor and their contact details, the date and version, the scope and basis of the estimate, and how changes will be approved. This helps the client identify the estimate and see which work and materials the total covers.
When quantities, materials or the list of work items change, update the date and version number. The client and contractor can then identify the estimate they discussed and see what changed in the new version.
Below are eight fields for the header, examples of how to separate labor and materials, and a template you can fill in before sending the estimate to the client.
Contents:
Why an estimate needs a header
The date and version number in the header show which version you used to agree on the terms. If measurements change the quantities or new items are added, assign a new version number and briefly record what changed.
The project name and address tie the estimate to a specific site. The contractor’s contact details tell the client who can answer questions about line items and amounts. This helps when a conversation includes several files or projects.
In 101, separate estimates cover individual stages of a project. The project manager combines the confirmed estimates into one consolidated estimate so the client can see the scope of work and the total for the project.
Eight fields to include in an estimate header
Check these eight fields before sending the estimate. Each helps the client verify the site, the terms of the estimate or how changes will be handled.
| Header field | Why it matters |
|---|---|
| Project name or site name | It makes the document easy to find in correspondence or in a folder, without relying on filenames such as “Estimate_final_2”. |
| Address | It distinguishes similar sites when several projects are underway. |
| Client | It records who agreed to the terms and who accepts the estimate. |
| Contractor and contact details | It identifies the company or independent contractor and gives the client one point of contact for questions about the estimate. |
| Date and version | They distinguish the current estimate from earlier copies and identify the version the parties agreed on. |
| Scope of the estimate | It shows what is included, such as labor only, labor and materials for preparatory work, labor and all materials, or specific sections only. |
| Basis of the estimate | It lists what you used to prepare the estimate, such as measurements, a design plan, a work specification, photos or a site visit. |
| Notes on changes | They explain how additional work is added and what counts as a change in quantities. |
Before sending the PDF, review the first lines of the document. The client should be able to tell which site the estimate covers and what is included in the total.
How to show labor and materials in the header
Combining labor and materials in one amount without an explanation often leads to disputes. Use the estimate header to explain what the total covers. Otherwise, the client may take the total as the price for everything, while the contractor expects materials to be listed separately or purchased separately.
Briefly explain the breakdown of the estimate and how changes are handled in the header. When the total changes, the next version will then show how it differs from the previous one.
- List labor and materials separately in the header if materials are included. Otherwise, state that the estimate excludes materials.
- Specify what purchasing covers, such as materials for preparatory work, finish materials, consumables, delivery and carrying materials upstairs.
- State separately how the amount will be recalculated based on actual measurements, approved additional work, or a material substitution.
How to prepare an estimate header in the 101 app
Before sending an estimate from 101, open the final document and check the header details, the work included and the amounts. Check them again if you recalculate or copy the estimate. Check the generated document even if the details are already in the project. For instructions on preparing the overall document, see the guide to consolidated estimates (in Russian).
You can prepare a stage estimate on your phone while on site or after taking measurements. Generate the final document after you have checked the estimates you need and they have been confirmed.
Follow these steps.
- If you do not have a project yet, create one. Enter the site name and select the client from the company members. Selecting the client links the estimate to their record and does not grant them access to the project.
- Check the site and client details and the contractor’s contact information that should appear in the document.
- Choose an expense category. It determines the type of expense and which sources you can use to add line items. Enter the stage name in the estimate description.
- Check the expense category settings and your permissions. Add line items from the attached price list or enter them manually, depending on which options are available. Check the item names, quantities, unit rates and total.
- Prepare a separate estimate for each stage you need. Once the stage estimates are confirmed, combine the required estimates into a consolidated estimate for the project.
- Check the header, the work and materials included, and the amounts in the generated document. In the mobile app, you can share a PDF. If you are using the web app, choose PDF or Excel, depending on which formats the selected document type supports.
If the document needs your company logo, check whether your subscription includes custom branding. Open the generated file before sending it and make sure the logo and the required company details appear.
If you would like to go through these steps using your own project, book a demo of 101.
Common mistakes in estimate headers
Before sending the estimate, check the date, site address and scope so the client can match the file to your proposal.
Use this checklist to review the header.
- The header has no date or version number, or the version is called “final” without a number.
- It is unclear whether materials are included, or there is no breakdown of what the estimate covers.
- The client and site are missing, so the estimate looks like a generic template.
- The contractor’s contact details are buried at the end of the file or missing.
- Notes say details will be clarified during the job but leave out what counts as a change.
Copyable estimate header template
Copy this template to the top of a PDF or use it as a starting point when describing an estimate in correspondence. It works for estimates for apartment renovations and for work on houses.
Project: ____________________
Address: ____________________
Client: ____________________
Contractor: ____________________ (contact details: ____________________)
Date: ____________________ Version: ____________________
Scope: Labor ____________________. Materials ____________________ (included/excluded/listed separately).
Basis: Measurements/work specification/design plan ____________________.
Changes and additional work: Document the separate approval before adding the changes or additional work to the next version of the estimate.